Easterhouse Ramp



Contractor : Kier
Location : Glasgow, Scotland

Working for Kier as the main contractor and with Network Rail as the client, Miller Fabrications were contracted to fabricate and install a 96m long DDA compliant ramp weighing over 55 tonnes.

The Ramp was built in 8 sections, each measuring 12 meters. In order to reduce the number of ‘track possessions’ required to install the ramp, each section was fabricated to DDA compliant standards in our workshops before arriving onsite. To further reduce ‘track possession’ time certified lifting brackets were fabricated onto each section of the ramp allowing for quick and easy installation by crane onsite. The landing section of the ramp was transported to site under police escort. Installation of the ramp was achieved in only 3 ‘track possessions’ each lasting 8 hours.

Aaa
Bbbbb
Bbbbbb
Ccccc
Ddddd
Dddddd
Ddddddd
Eeeee
Fffff
Ffffff
Ggggg
Iiiii
Jjjjj
Kkkkk
Lllll
Mmmmm
Nnnnn
Ooooo
Ppppp
Qqqqq
Rrrrr
Ttttt
Uuuuuu
Vvvvv
Vvvvvv
Wwwww
Wwwwww
Wwwwwww
Xxxxx
Yyyyy

Clients          News          Contact

Logo